SLOT GUSSET PL THROUGH COLUMN CONCRETE FOOTING, SEE PLAN AND SCHED STEEL BASE PLATE, SEE BRACED FRAME COLUMN SCHEDULE STIFFENER PLATES EACH SIDE, SEE STEEL COLUMN SCHEDULE CONCRETE BLOCKOUT AT BRB CASING AS REQ'D BY BRB SUPPLIER, SEE NOTE 2 DEMAND CRITICAL GUSSET PL TO BACKSIDE OF COLUMN COLUMN TO SBP, PJP 3/8 5/16 5/16 2" CLR FOAM OVER BOLTS SO CONCRETE DOES NOT BOND TO PLATES OR BOLTS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe